Pictures from the 8th Work Day: 5-1-2010

 

Linoleum installed (6:40 am)

 

Cabinets and counter tops installed in kitchen

 

Cabinets and counter tops installed in bathrooms

 

Linoleum in hallway

 

Morning devotional (7:37 am)

 

Painting interior doors

 

Registration (8:57 am)

 

Power to the house through the breaker box

 

Break time (10:06 am)

 

Painting interior door

 

Improvised rain cover over siding saw (11:32 am)

 

Lunch time (11:37 am)

 

House at end of day (2 pm)

 

Closet shelf and rod installed

 

Front porch soffit installed

 

No work on 5/8/10 (Mother's Day Weekend)

Pictures from the 9th Work Day 5/15/10