
Pictures from the 8th Work Day: 5-1-2010
Linoleum installed (6:40 am)

Cabinets and counter tops installed in kitchen


Cabinets and counter tops installed in bathrooms

Linoleum in hallway

Morning devotional (7:37 am)





Painting interior doors


Registration (8:57 am)

Power to the house through the breaker box

Break time (10:06 am)


Painting interior door

Improvised rain cover over siding saw (11:32 am)

Lunch time (11:37 am)

House at end of day (2 pm)

Closet shelf and rod installed

Front porch soffit installed

No work on 5/8/10 (Mother's Day Weekend)
