Build Pictures: Nissan- Sponsored House 4/6/10

Tubs installed and insulation installed behind tubs in walls

Rough plumbing installed and tubs plumbed in

The house passed rough plumbing and rough electrical inspections, was insulated and sheet rock hung this past week.  However the sheet rock will probably not be ready for paint on 4/10 so we will be concentrating on installing vinyl siding on 4/10/10.

4/10/2010 Pictures