Nissan Sponsored House Pre-Build
1-31-2010 gravel driveway covered with snow

1-31-2010 foundation dug - note snow so can not pour concrete footers


2-20-2010 foundation finished and blocks laid

2-20-2010 top plates installed on blocks and triple 2X beam built and installed


2-27-2010 Outer band and floor joists being installed for floor system


2-28-2010 Lot before cleanup begin by Juarez family & friend (Mario from Africa)


2-28-2010 Floor joist install completed

2-28-2010 Gluing down & installing the Advantech 50 yr flooring


2-28-2010 half of floor deck installed - ready for 1st work day 3-6-2010

2-28-2010 Sand box on jobsite

2-28-201 lot cleanup continues by Juarez family & Mario