
April 2, 2011
(Smith Family)

House at begin of day (6:33 am)

Devotional (7:30 am)


JROTC WCHS formation to get instructions

JROTC move gravel from pile to foundation porches – fill up porches


Work on roof (9:22 am)

Framing inside walls


Work on roof (10:41 am)

JROTC fill up porch with gravel using wheel barrow

Lunch (11:56 am)

Interior wall framing (12:00 noon)


Interior wall framing (4:51 pm)


Outside of house at end of day (5 pm)



