April 2, 2011

(Smith Family)

 

House at begin of day (6:33 am)

 

Devotional (7:30 am)

 

JROTC WCHS formation to get instructions

 

JROTC move gravel from pile to foundation porches – fill up porches

 

Work on roof (9:22 am)

 

Framing inside walls

 

Work on roof (10:41 am)

 

JROTC fill up porch with gravel using wheel barrow

 

Lunch (11:56 am)

 

Interior wall framing (12:00 noon)

 

Interior wall framing (4:51 pm)

 

Outside of house at end of day (5 pm)

 

4/9/11 Pictures