April 2, 2011
Habitat Sponsored Home
(Cherry Family)
House at begin of day (6:34 am)


Devotional (7:35 am)


JROTC WCHS formation to get instructions (7:53 am)

JROTC move gravel from pile to foundation porches – fill up porches


Plastic (termite shield) and top plates being installed on the foundation (9:21 am)



Outside banding being installed on top plates (10:28 am)

JROTC use wheel barrow to fill up porch with gravel


Lunch (11:56 am)

Floor system at end of day (3:24 pm)