4/14/2012
( Patterson Family – 139 Fair Street)
Floor system at beginning of day (6:18am)


Installing floor joist braces (7:51am)

Registration

Saw crew

Building pars and corners

Installing floor joist braces

Morning Devotional (8:37am)


Framing the first wall (back wall) (8:57am)

Nailing down the floor decking

Install OSB sheeting on back wall (9:15am)

Future home owners – Mr & Ms Patterson


Wrapping first wall


First wall ready to set up (9:53am)

First exterior wall (back wall) raised and set in place (9:54am)







Second exterior wall (front wall) raised and set in place (11:40am)





Third exterior wall (left side wall) raised and set in place (12:47am)

Fourth exterior wall (right side wall) raised and set in place (12:58am)

OSM sheeting installed on exterior side wall (1:24pm)



Jesus Christ Heavenly devoted son patch

Build status at end of day (2:30pm)